    And then everybody clapped. “Wires are crossed. $6,500. 21 days to fix.” Am I playing pretend with my nephew?

    • adarza@lemmy.ca
      link
      fedilink
      English
      arrow-up
      4
      ·
      3 days ago

      it’s not unheard of. i had an outlet that wasn’t on my own electrical service. when they replaced the fuseboxes in the back with breaker boxes they double-checked what circuits went to which units and it got ‘fixed’. the fridge was running on that outlet when i moved in.

      • WolfLink@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        2
        ·
        3 days ago

        Switching neutral with live generally won’t cause any issues. Switching neutral with ground is much worse but most likely would go without major issues. Switching ground and live would make things just not work at best, and become a huge fire and/or electrocution hazard at worst.

        • halcyoncmdr@piefed.social
          link
          fedilink
          English
          arrow-up
          4
          ·
          3 days ago

          I’m 99% sure neither the original post or the one you are responding to are talking about crossed wires inside an outlet. They’re talking about an entire outlet/switch/etc. being on the electrical service for a neighboring unit.

          So someone is paying for the usage of a neighbor. And if power is shut off for non-payment, they move out, etc. then one of the outlets will seemingly randomly stop working because it’s on a different electrical service.

          • BigDiction@lemmy.world
            link
            fedilink
            English
            arrow-up
            3
            ·
            3 days ago

            Yup that’s a service panel serving one or more units in a neighboring unit. Electrical plus ripping up drywall to run a new wire from the correct panel.

            Depending on the run this is probably about right.

    • Windex007@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      3 days ago

      I’m not sure.

      It’s not saying it’s real but I can envision a world where it’s at least conceivable.

      They’re not saying it should take 21 days of labour, just that they have 21 days to be compliant.

      And the runs between units might indicate other issues like insufficient panel sizes, or long runs of wall that are expected to get cut up and are expected to be repaired properly. Maybe permits and subsequent electrical inspections. They might even pad all their estimates too.

      It’s high, but not impossibly high.