• 0 Posts
  • 3 Comments
Joined 1 year ago
cake
Cake day: July 22nd, 2023

help-circle

  • I was a nuclear operator in the Navy. Here are the actual reasons:

    1. The designs are classified US military assets
    2. They are not refuleable
    3. They only come in 2 “sizes”: aircraft carrier and submarine
    4. They are not scaleable. You can just make a reactor 2x as big
    5. They require as much down time as up time
    6. They are outdated
    7. The military won’t let you interrupt their supply chain to make civilian reactors
    8. New designs over promise and underdeliver
    9. They are optimized for erratic operations (combat) not steady state (normal power loads)
    10. They are engineered assuming they have infinite sea water available for everything

    There’s more but that’s just off the top of my head