![](/static/61a827a1/assets/icons/icon-96x96.png)
![](https://lemmy.world/pictrs/image/0da8d285-3457-4e5b-af21-b38609b07eea.webp)
7·
5 months ago“is usually written by an over worked engineer”
I’m in this post and I don’t like it.
But really these scada systems are rarely well defined by the time implementation happens. Often the architect has a great plan, but by the time it’s passed to a manager, a non-software engineer, to the product engineer to the automation team to the contractor the end result is “X data is pushed in With Y form and we use either a,b,or c date time stamp any nobody knows”
This might sound bad but I wish I had a similar level of resolve. I tolerate far too much insanity from people in my family.